Cart Mounted Side Burner Installation (LCB2-3)
Once the side burner is mounted to the grill the gas con-
nections can be made. Refer to the illustrations on the
right for proper gas installation examples.
After the side burner gas connections are made it is rec-
ommended that a leak test be done on all gas line fittings.
Apply a soap and water solution to all connections and
look for bubbles to form which indicate a gas leak. If no
bubbles are present, make the electrical connections
The side burner is electrically connected to grill at the
transformer. Disconnect the transformer from the grill
and plug in the side burner as shown in the illustration
below.
Finished Dimensions