Installation Instructions

Page 3
STEP 5. INSTALLING SHOWER WALL IN ALCOVE
a. Peel back protective lm along bottom edge of back and side panels.
b. Apply a generous bead of adhesive below mark on each back panel stud only
(follow adhesive manufacturers recommended instructions).
c. Place back panel and center on base.
d. Apply adhesive to studs for side panel opposite the shower controls and place
side panel.
e. Apply adhesive to studs for faucet side panel and place side panel. (Fig. 8)
f. Center wall panels on shower base. Make sure panels are resting at on base.
g. Reposition shims if needed.
a. Press back panel rmly into place and align the front of the side walls to the
front of the shower base and screw back panel nail ange to studs.
b. Apply pressure to one side panel, directing the pressure towards back panel,
then screw vertical nail ange to stud. Repeat for opposite side panel.
c. Screw top ange of side panels to studs.
d. Panels must be held tight to studs during drying process. Apply pressure to
panels while adhesive dries with cross bracing. (Fig. 9)
IMPORTANT - Failure to adhere panels and screw all anges to all studs will
void warranty
STEP 6. CAULKING
a. When installed on any Lyons shower base your Linear™ wall is designed to
function properly without seams being caulked.
b. Caulk must be applied around holes for the faucet, diverter valve and shower
head.
c. If your Linear™ wall is used on a shower base other than a Lyons, it is required
to caulk all seams.
STEP 7. FINISHING
Green Board or Other Finishing Boards
a. Shim studs with lattice strips or 1/4" luan so that nishing board will overlap
nail anges. (Fig. 10)
Tile
a. Install nishing board up to (not over) nail anges.
b. Install tile over nishing board and nail anges.
CLEANING
Do not use any abrasive cleaners or metal scrapers.
If drywall mud or plaster gets on a nished surface it may be carefully removed
with a wooden scraper made from a piece of scrap wood.
Adhesive may be removed with mineral spirits.
Ideal cleaners are Soft Scrub Gel®, Comet Gel® or 409®.
WARNING: Some cleaning products are not suitable for use. Read all labels
carefully. DO NOT USE if they say not suitable for use with ABS, acrylic
or polystyrene". Always rinse cleansers thoroughly within ve minutes of
application.
FIGURE 7. Mark studs.
FIGURE 8. Apply adhesive.
FIGURE 10. Shim studs.
MARK TOP OF STUD
CENTER ASSEMBLED
WALL ON
BATHTUB/SEATED BASE
FIGURE 9. Apply pressure by cross bracing left and right panels
while also applying pressure to the back panel.
DO NOT RETURN PRODUCT OR CONTACT STORE!
FOR QUESTIONS OR CONCERNS
please call or e-mail our customer support team
8:00am-4:30pm EST. Monday - Friday
1-800-458-9036
lyonssupport@lyonsindustries.com