Installation Instructions
Page 1
DO NOT RETURN PRODUCT!
FOR QUESTIONS OR CONCERNS
1-800-458-9036 lyonssupport@lyonsindustries.com
SUPPLIES YOU WILL NEED:
1-5/8" Stainless Steel Screws
Wood Shims (Optional)
Construction Adhesive
Mortar Compound (Optional)
Drain & Overow Assembly with Extension
100% Silicone for Drain
TOOLS YOU WILL NEED:
Level
Square
Jig Saw
Tape Measure
Pencil
Power Drill
Safety Glasses
STUD LAYOUT. Most standard bathtub walls
will t Lyons Victory™ bathtub
Subject to manufacturing tolerance of [+] or [-] 1/8"
Victory™ 603016 AFR Bathtub (VTLUxx603016)
17"
29⁄"
16"
1"
59⁄"
= stud location
Left-hand drain shown—reverse layout for right-hand drain.
31½"
60"
11"
14⁄"
6"
8½"
Drain C
L
Floor Cut Out
(6" x 10")
COMPLIANCE CERTIFICATIONS:
ANSI Z124.1 AND CAN/CSAB45
CAN/ULC S102.2 FLAME75
SMOKE DEVELOPED485 CODE
IMPORTANT
• Read installation instructions carefully before starting project
• Peel back protective lm to verify color before installation
• Allow bathtub to reach room temperature before installation
• Do not use plumber’s putty. Will cause product failure and void warranty.
Use a highgrade silicone caulk for all necessary locations
• Do not use sulfuric acid to unclog drain. Will cause product failure and void warranty.
Use plunger or snake to clear obstruction.
• Keep instructions for warranty information