Installation Guide

6
Build a structure based on the dimensions in the chart
below.
IF STRUCTURE IS ALREADY BUILT CHECK THAT
IT RESPECTS THE DIMENSIONS BELOW
COMPATIBLE BASES No. A B C D
Olympia square 4832 106011
Between
48"- 48 1/4"
33 1/2"
16" 24"
Olympia square 6032 106012
Between
60"- 60 1/4"
16" 8 1/2"
B3 Square 4832
420001-5XX
Between
48"- 48 1/4"
33 1/2" 16"
24"
B3 Round 4832 410001-5XX
B3 Square 4836 420003-5XX
37 1/2" 18"
B3 Round 4836 410003-5XX
B3 Square 6032 420005-5XX
Between
60"- 60 1/4"
33 1/2" 16"
8 1/2"
B3 Round 6032
410005-5XX
B3 Square 6036 420006-5XX
37 1/2" 18"
B3 Round 6036
410006-5XX
Verify the wall studs are square, plumb and the
ooring is perfectly level.
6"
6"
C
With foam reinforced bases (Olympia),
use self-leveling mortar to level the
oor.
For a worry free installation follow
all instructions and check them off
as you go.
Cut out an approximate 6" x 6" opening around
the drain center outlined by measurements C and
D. See image to the right and the chart above. We
recommend that a plumber completes the drain pipe
connection.
A
B
C
D
Top view of structure
Leveling the oor is
critical for wall alignment
1.1
Check me!
1.2
Check me!
1.3
Check me!
D
1
STEP Building the structure
Before starting make sure to have all
parts and components refer to page 4.