Installation Guide

13
Install the side wall (15) with the drilled faucet hole(s).
Lift the wall approximately 3" above the deck of the
bathtub, push it completely against the back wall then
lower the side wall into position.
Quick tip
With a 1/8" bit, drill holes in the side wall fastening flange
(15) at the top aligned with each stud. Only pre-drill
the flange not the studs. Then, secure the side wall
(15) with one #8 x 1¼" screw (not included) in one of the
pre-drilled holes.
IMPORTANT: HAND TIGHTEN ONLY. DO NOT
OVER-TIGHTEN THE SCREW.
3
1
Side wall
Back wall
Bathtub
Side wall
5
STEP Temporary installation of
the side walls (Cont'd)
The side wall should now line up
with the front of the bathtub.
Quick tip
Place a level
vertically on the side
wall. If the wall is not
straight, make sure
that the x-fasteners
are properly inserted
5.6
Check me!
5.7
Check me!
It is critical that all 3 retraction pins
engage with the X fasteners. There
should be no gap between the walls.
Deck
BEFORE CONTINUING,
VALIDATE THAT ALL
THE WALLS ARE LEVEL,
PLUMB AND SQUARE
5.8
Check me!