User Instructions

18
FCK Information
Several detectors can be calibrated with one FCK. The only limitation is the amount of gas in the cylinder and the flow of the regulator.
The 34 liter cylinder for example with a 0.5LPM regulator has approximately 68 minutes of continuous calibration run time.
Replacement cylinders are available. The gas cylinder should be replaced when the pressure gauge on the regulator shows 25-psi or
less.
Note: For optimum test results it is suggested that the unit be in clean air (green light on) and be in a low ambient air flow
Gas Testing
Testing the Fan Relay –
1. Remove the Philips screw on the front of the TX-12-AM. Remove the front cover.
2. Open the FCK. Connect the 25 ppm gas cylinder to the regulator.
3. Check the pressure gauge on the regulator. If you have 25-psi or less you will need to replace the gas canister.
4. Assemble regulator, hose and test hood and place the Test Hood over the gas sensor.
Note: The time to activate the Fan relay depends on the delay setting.
5. Turn on the regulator to start the gas flow and wait with the gas applied continuously.
6. With the display function turned “On”, the TX-12-AM will show the current concentration of gas or “0” (zero) in clean air. When
the gas concentration reaches the Fan Relay setting (20 ppm, for example) the display will flash back and forth between “FAn”
and “20”. With the display function turned ”OFF”, the display does not show the gas concentration, but will show “FAn” as long
as the fan relay is activated.