Installation Manual

© 2014 Magnum Energy, Inc.Page 7
Installation
2.5 Power-up Self Test
Info: All power to operate the remote control is provided by the inverter/charger
through the remote cable.
When the ME-ARC is first connected to an inverter, a power-up self test is initialized. During the
self test, the LCD automatically displays in sequence:
“MAGNUM ENERGY Self Test”, then
“(C)2010-2013, Connecting to...”, and then
“ME-ARC V 4.0, INV/CHG V #.#”
The remote’s LEDs also change with the screens (see Figure 2-7).
FAULT
PWR
CHG
INV
MAGNUM ENERGY
Self Test
FAULT
PWR
CHG
INV
(C)2010-2013
Connecting to..
FAULT
PWR
CHG
INV
ME-ARC V 4.0
INV/CHG V #.#
No LEDs light
PWR lights green
FAULT lights red
CHG lights green
INV lights green
CHG lights green
INV lights green
After the self test is nished the remote displays “Set Clock”. Use the ARC’s SELECT knob to set
the correct time by selecting hour, minutes, and either AM or PM (see Figure 2-8 below, and the
Set Clock procedure on page 19). Once the ARC’s clock is set, the inverter Home screen displays.
Figure 2-7, Power-up Self Test Screens
Set Clock
Minute = 11:18A
Set Clock
Hour = 11:18A
Set Clock
AM-PM = 11:18A
[Inverter Status]
DC 12.6V 100A
Inverter Home screen
Figure 2-8, Self Test Set Clock Screens