Operation Manual

4
UNPACKING INSTRUCTIONS
1. Place the unit in the correct upright position before unpacking.
2. Cut the two packing straps.
3. Slide the carton in an upwards motion and it will release from the base.
4. Grip the carry handles located on either side of the unit and carefully lift until it slides
out of the foam base.
5. Disconnect the tie-in inside the exhaust tube and take out
the exhaust tube
6. Install the exhaust tube on the unit before operating the unit.
CONTENTS
1 / Air control unit
2 / 1-remote control unit (batteries not included – size 1.5 VOLTS UM4 AAA CR03
required)
3 / Batteries
5
NAME OF THE PARTS
1. Control panel
2. Remote receiver
3. Adjustable air vent
4. Joint tube
5. Exhaust tube
6. Up drain pipe
7. Cool air inlet
8. Cool air filter
9. Hot air inlet
10. Hot air filter
11. Drain pipe