A. Pipe Clearances to Combustibles
WARNING! Risk of Fire! Maintain air space clearance
to vent. DO NOT pack insulation or other combustibles:
• Between ceiling restops
Between wall shield restops
Around vent system
Failure to keep insulation or other material away from
vent pipe could cause overheating and re.
5
5
Vent Clearances and Framing
B. Wall Penetration Framing/Firestops
Combustible Wall Penetration
Whenever a combustible wall is penetrated, you must
frame a hole for the wall shield restop(s). The wall shield
restop maintains minimum clearances and prevents cold
air in ltration.
The opening must be framed on all four sides using the
same size framing materials as those used in the wall
construction.
DVP pipe - A wall shield restop must be placed on
each side of an interior wall. A minimum 1-1/2 in. (38
mm) overlap of attached heat shields must be main-
tained.
See Section 7.F. for information for regarding the instal-
lation of a horizontal termination cap.
Non-Combustible Wall Penetration
If the hole being penetrated is surrounded by non-com-
bustible materials such as concrete, a hole with diameter
one inch greater than the pipe is acceptable.
Note: Do not pack the gap with insulation.
Whenever a non-combustible wall is penetrated, the wall
shield restop is only required on one side and no heat
shield is necessary.
Figure 5.1 Horizontal Venting Clearances To Combustible
Materials
Note: Heat shields MUST overlap by a minimum of 1-1/2 in. (38 mm).
DVP heat shield - designed to be used on a wall 4 in. to 7-1/4 in.
(102 mm to 184 mm) thick.
,IZDOOWKLFNQHVVLVOHVVWKDQLQWKHH[LVWLQJKHDWVKLHOGVPXVWEH
ILHOG WULPPHG ,I ZDOO WKLFNQHVV LV JUHDWHU WKDQ  LQ D '93-
HSM-B will be required.
(DVP Pipe Shown)
3 in. (76 mm)
top clearance *
1 in. (25 mm)
clearance
bottom & sides
Heat
Shield
Wall
Shield
Firestop
Heat
Shield
WALL
3 in. (76 mm)
top clearance
1 in. (25 mm)
clearance around
vertical sections
Figure 5.2 Wall Penetration
* Shows center of vent framing hole for top venting. The
center of the hole is one (1) in. (25.4 mm) above the
center of the horizontal vent pipe.
MODEL A* B
ECHEL36IN
ECHEL48IN
ECHEL60IN
63 in. 62 in.
1.60 m 1.57 m
ECHEL36STIN
ECHEL48STIN
ECHEL72IN
75 in. 74 in.
1.9 m 1.9 m
A
10 in.
12 in.
B
DO NOT PACK WITH
INSULATION OR
OTHER MATERIAL