Figure 5.8 Ceiling/Attic Construction
Install Flashing
Assemble chimney so it passes through the framed
opening.
Slip the ashing over the chimney.
NOTICE: Roongshinglesmustbebelowtheashing
plate on the lower side of a sloped roof and over the
ashingplateonthesidesandtop.
Nail the ashing to the roof. Keep gaps between the
ashing plate and the roof to a minimum.
Caulk the ashing plate and roof junction as well as
the vertical seam on the ashing. All nail heads must
be caulked with a roong sealant.
Caulk the overlap seam of any exposed pipe sections
that are located above the roof line to prevent leaks.
Slope Downward
(1/4 in. per foot
minimum)
Turn-down
Drip Edge
Chase
2 in. (51 mm) Collar
on Chase Top
.018 (26 ga) min.
Galvanized
Chase Top
Figure 5.9 Chase Top Construction
G. Install Chase/Chase Top
You MUST use a chase top in a chase installation.
Chase tops may be eld constructed.
Include a turndown and drip edge to prevent water
from seeping into the chase.
Include a 2 in. (51 mm) soldered, welded or spun
collar around pipe opening to keep water out.
Provide a 1/8 in. (3 mm) gap around the ue pipe.
Slope the chase top downward away from the
opening.
WARNING! Risk of Fire! DO NOT caulk the pipe to the
chase top collar.
Caulk all seams to prevent leaks.
F. Roof Penetration
Refer to Figure 5.8.
Plumb from roof to center of chimney.
Drive a nail up through roof to mark center of pipe.
Measure to either side of nail and mark the 14-1/2 in. x
14-1/2 in. (368 mm x 368 mm) opening required.
Measure opening on the horizontal; actual length may
be larger depending on roof pitch.
Cut out and frame opening.