Operation Manual
11 ENGLISH
3. Turntheadjustshaftandsetthestepofthe
changeplatesuitableforthenaillength.Makesurethat
the arrow points to the corresponding graduation incre-
mentofthenaillengthmarkedontheadjustshaft.
►Fig.14: 1.Changeplate2.Adjustshaft3. Arrow
NOTICE:Ifthetoolisoperatedwiththechange
platesettothewrongstep,itmayresultinpoornail
feedingortoolmalfunction.
4. Place the nail coil over the change plate and
uncoil enough nails to reach the nail rail.
Thenplacetherstnailinthenailrailandthesecond
nailinthefeedclaw.Also,placeotheruncoilednailson
feederbody.
►Fig.15: 1. Nail rail 2. Feed claw
5. Checkthatthenailcoilissetproperlyinthe
magazine.
6. Closethemagazinecapcarefully.Thenwith
depressingthelatchlever,closethedooruntilthelatch
lever locks.
Connecting air hose
CAUTION: Do not connect the air hose with
a nger on the trigger. An unexpected driving will
causeseriousinjury.
►Fig.16: 1.Airtting2. Air socket
Sliptheairsocketoftheairhoseontotheairttingon
thenailer.Besurethattheairsocketlocksrmlyinto
positionwheninstalledontotheairtting.
A hose coupling must be installed on or near the tool in
such a way that the pressure reservoir will discharge at
the time the air supply coupling is disconnected.
Changing the trigger for contact
actuation mode
CAUTION: Always disconnect the air hose
and unload the tool with nails before replacing
the trigger.
CAUTION: After the trigger replacement,
always check that the tool operates properly
before actual work. Do not load the tool with any
nails before checking the function to avoid unex-
pected nailing.
Thetriggerforsinglesequentialactuationmodeis
factory-installed.Tochangethenailingmodetocontact
actuation,replacethetriggerpartwiththeoneforcon-
tact actuation.
►Fig.17: 1.Triggerforsinglesequentialactuation
(Gray color) 2.Triggerforcontactactuation
(Black color)
1. Turnthetriggerlocklevertothelockposition
.
►Fig.18: 1.Triggerlocklever
2. Pushthepinsecuringthetriggerfromtheure-
thanewasherside,andthenremovetheurethane
washer.Thenpulloutthepinandremovethetrigger.
►Fig.19: 1. Pin 2. Urethane washer 3.Trigger
3. Setthetriggerassemblyforcontactactuation.
Withpushinginthehingedpartinward,setthetrigger
sothatthehingedpartisundertherodofthevalvein
the housing.
►Fig.20: 1. Hinged part 2.Rodofthevalve
4. Insert the pin to the hole and secure it by urethane
washer.
5. Connecttheairhose,andmakesurethatthe
tooloperatesproperly.Refertothesection“Checking
properactionbeforeoperation”.
NOTE:Tosetbacktosinglesequentialactuation,
followtheproceduresforchangingthetriggerabove.
OPERATION
CAUTION: Make sure all safety systems are in
working order before operation.
CAUTION: When operating the tool, do not
close the face to the tool. Also keep hands and
feet away from the ejection port area.
CAUTION: When not operating the tool,
always lock the trigger by turning the trigger lock
lever to the lock position .
CAUTION: Make sure that the trigger is
locked when the trigger lock lever is set to the
lock position .
Checking proper action before
operation
Beforeoperation,alwayscheckfollowingpoints.
— Make sure that the tool does not operate only by
connecting the air hose.
— Make sure that the tool does not operate only by
pulling the trigger.
— Make sure that the tool does not operate only by
placing the contact element against the workpiece
without pulling the trigger.
►Fig.21: 1.Contactelement2. Workpiece 3.Trigger
(not pulled)
— Insinglesequentialactuationmode,makesure
that the tool does not operate when pulling the
triggerrstandthenplacingthecontactelement
against the workpiece.
►Fig.22
Nailing method
Topreventthetriggerfrombeingaccidentallypulled,
the trigger lock lever is provided.
Tolockthetrigger,turnthetriggerlocklevertothelock
position
.
Tousethetool,turnthetriggerlocklevertotheunlock
position .
►Fig.23: 1.Triggerlocklever2.Trigger