Instruction manual
TOOL INSTALLATION INSTRUCTIONS AND USE
Lubrication
To insure maximum performance, install the air
set
(oiler, regulator, air filter)
as
close
as
possible to the
tool. Adjust the oiler
so
that one drop of oil will be
provided for every
30
nails.
When the air
set
oiler is not used, oil with
a
few drops
of turbine oil through the air plug both before and
after nailing operations. Simply
oil
before use, but
when oiling after use, operate the tool several times
to assure good lubrication. This makes certain the oil
works into and throughout the tool to prevent rust-
ing. When using the tool for
a
long time, oil during
nailing operations.
Loading nailer
CAUTION:
Always disconnect the air hose before loading the nails into the nailer
I
Pull the pusher until it
is
locked by the lock lever.
I
Pusher
I
Insert strip of nails into the magazine. Two strips of
nails can be loaded
at
a
time.
Make sure that when loading the second strip the first
nail of the second strip
sets
on (overlaps) the
last
nail
of the first strip.