NO. Part name Assembling Instructions
3
STOP SWITCH
∼CONTROL CABLE
∼LEVER,THROTTLE
(1) Put off an COVER,AIR CLEANER.
(2) Connect the lead wires of the STOP SWITCH with the corresponding lead
wires of the COIL. Let the former lead wires through the hole of the CASE
2,VOLUTE and the STOP SWITCH terminals. Let the latter lead wires (the
black one above and red one below) through the helical groove at the
INSULATOR. Set the terminals downward.
(3) Insert the CONTROL CABLE (the end with the elbow attached) into the screw,
letting the CONTROL CABLE through the hole of the CASE 2,VOLUTE.
(4) Fix the STOP SWITCH. Tuck the lead wires in between the guides and press
the wires with the CONTROL CABLE.
At last,fix the LEVER,THROTTLE.
(5) Fix the COVER,AIR CLEANER with screws.
SCREW ASSY
W,SW M5X14(1pc)
Tightening torque 5∼10 ㎏・
㎝
(By manual acceptable)