Parts List

Fig. 2
Fig. 3
[3] DISASSEMBLY/ASSEMBLY
[3] -1. Shear blade complete
DISASSEMBLING
1. Remove Under cover by
unscrewing four M4x10
Pan head screws.
2. Remove Shear blade complete by
unscrewing four M5x14 Pan head screws.
And remove two Nylon sleeves from
Shear blade complete.
Shear blade viewed
from Front grip side
Nylon sleeve
(2 pcs.)
Nylon sleeve (2 pcs.)
Spur gear section
Spur gear section
ASSEMBLING
1. Pass Spindle through Flat washer 8 and then set them
in Bearing box complete so that the depressed side of
Spur gear 93 faces to Bearing box complete.
M5x14 Pan
head screw
(4 pcs.)
M5x14 Pan
head screw (4 pcs.)
M4x10 Pan head
screw (4 pcs.)
Under
cover
Disassemble Shear blade complete as drawn in Fig. 2.
Assemble Shear blade complete to the machine as drawn in Fig. 3.
Flat washer 8
3. If Nylon sleeves are left in
the holes of Spur gear section,
remove them after disassembly
of Super gear section.
Flat washer 8
Mating line of Housing L
and Housing R
2. Turn Spur gear 93 until its holes come on
the mating line of Housing set.
Flat washer 8
Spindle on the projected side
of Super gear 93 to Under cover
(Also refer to Fig. 12)
Spindle on
the depressed
side of Supper
gear 93 (Also
refer to Fig. 12)
Bearing box complete
Dust guard
Nylon sleeve
(2 pcs.)
Pins of Shear blade
complete (2 pcs.)
3. Set two Nylon sleeves to two pins of Shear blade
complete.
4. Set Dust guard to Shear blade complete.
Note: Dust gurad is not directional when assembled
with Shear blade complete.
5. Inserting the Nylon sleeves into the holes of
Spur gear 93, set Shear blade complete in place.
Do not forget to set Flat washer 8 to Spindle.
Repair
P 3/ 13