User Manual

11 ENGLISH
4. Prepare the crank and new shear blades.
1
2
►1. Crank 2. Shear blades
5. Remove the blade cover, and then attach it to the
new shear blades.
6. Applyasmallamountofgreasetotheperipheryof
the crank. Attach the washer, gear, and the crank to the
pin in order.
1
2
3
4
►1. Crank 2. Gear 3. Washer 4. Pin
7.
Adjustthecranksothatthe2smallholesonthecrank
arelineduponthealignmentlineasshowninthegure.
1
2
►1. Alignment line 2. Small hole
8. Slide the shear blades so that the hole on the
guide plate is positioned at the center of the rings of
blades.
1
►1. Guide plate
9. Insert the screw removed in step 2 into the hole on
the shear blades through the hole on the blade cover.
1
►1. Hole