Use and Care Manual

9 ENGLISH
1
2
3
►1. Hex wrench 2. Bolt 3. Base
Tiltthebaseuntilthedesiredbevelangleisobtained.
Theedgeofthemotorhousingindicatesthebevel
anglebygraduations.Thentightenthebolttosecure
the base.
1
2
►1. Edge 2. Graduation
Front ush cuts
1
2
3
►1. Hex wrench 2. Bolt 3. Base
Loosen the bolt on the back of the base with the hex
wrenchandslidethebaseallthewayback.Then
tighten the bolt to secure the base.
Cutouts
Cutouts can be made with either of two methods
“Boring a starting hole” or “Plunge cutting”.
Boring a starting hole
For internal cutouts without a lead-in cut from an edge,
pre-drill a starting hole 12 mm (15/32") or more in
diameter.Insertthejigsawbladeintothisholetostart
your cut.
Plunge cutting
Youneednotboreastartingholeormakealead-incut
if you carefully do as follows.
1. Tiltthetooluponthefrontedgeofthebasewith
thejigsawbladepointpositionedjustabovethework-
piece surface.
2. Apply pressure to the tool so that the front edge of
the base will not move when you switch on the tool and
gently lower the back end of the tool slowly.
3. Asthejigsawbladepiercestheworkpiece,slowly
lower the base of the tool down onto the workpiece
surface.
4. Complete the cut in the normal manner.