Instructions / Assembly

25 / 41
Route Controller lead wire connected to Sub controller
complete through this space.
Put Lead wires of Buzzer circuit in this Lead holder.
Don’t make a slack between Buzzer circuit and
Lead holder.
Put Lead wires bundled with tape in this
groove through Line filter A.
Put Connector of Buzzer circuit as shown above.
Line filter A
(
with Controller, without Tube)
A
A’
Pass Lead wire of Buzzer
circuit in this space.
Buzzer circuit
Sub controller complete (with Switch
)
Sub controller complete (without Switch
)
<Assembling of Area B>
Assemble Buzzer
circuit as shown below.
The cross section between A – A’
Buzzer circuit