Owner's manual

SECTION 1 - Installation
INSPECTION:
Inspect the package for damage. If damaged, notify the appropriate carrier immediately.
MOUNTING:
The Maverick IP Sub Metering Appliance must be mounted on a flat surface with four #6
sheet metal screws (not provided) as shown in Figure 2.
REQUIREMENTS:
• Tools (not provided)
- Digital Volt-ohm Meter (DVM).
- Appropriate screwdriver for mounting screws.
- Appropriate drill and drill bit for mounting screws.
• Four #6 sheet metal screws.
• Training: Installer must be a qualified, experienced technician.
Figure 2
Warning:
Caution:
Disconnect power supply before installation to prevent electrical shock and equipment damage.
• Make all connections in accordance with national and local electrical codes. Use copper
conductors only.
Use electrostatic discharge precautions (e.g., use of wrist straps) during installation and wiring
to prevent equipment damage.
• Avoid locations where severe shock or vibration, excessive moisture or corrosive fumes are
present.
• Do not exceed ratings of the device.
1.3.0
1.3.1
1.3.2
© Copyright 2009
® Registered trademark MAMAC SYSTEMS, Inc.
5 of 17
DN IS-IPSM101.1
4x 0.156” use #6
sheet metal screws
(not included) to
mount appliance
MAMAC SYSTEMS
3.70”
(94 mm)
4.00”
(102 mm)
3.61” (91 mm)
4.50” (114 mm)