888-230-2225 help@manhattancomfort.com 319 Ridge Rd. Dayton, NJ 08810, New Jersey - United States Rockefeller 20.
Included in the package Part 01 02 03 04 05 Description Base Top Lateral Rear Panel Hanger Bar Qty Box 01 01 02 01 01 01 01 01 01 01 02 04 03 05 03 01 Hardware A = 08x E = 02x F = 02x B = 12x G = 01x C = 04x H = 02x D = 02x I = 02x Tools needed (not included) 2x Rockefeller 20.
8" 17.32" 11 lb 16.14" .0 20 12 .40 11 lb " " .78 18 13 " 01 A = 04x B = 04x Connect the part (01) onto the parts (03) with the hardware (A + B). 03 03 A 01 B A B B B Rockefeller 20.
02 B = 02x Observe the correct position of the part (04) before connect onto the part (01) with the hardware (B). 04 01 B B 03 A = 04x B = 06x Connect the part (02) onto the parts (03, 04) with the hardware (B) and the hardware (A). B B B B B B A 02 03 A 04 03 Rockefeller 20.
04 C = 04x F = 02x I = 02x Connect the hardware (F) onto the part (01) using the hardware (C). Connect the hardware (I) into the part (05). I F F 05 C C 01 I C C 05 G = 01x Pass the part (05) through the hardware (F) and use the hardware (G) to tight the screw as shown on detail. F F Rockefeller 05 20.
06 H = 02x Observe the indicated height of the Floating Open Hanging Closet using the floor as reference (around of 72"). 72" You will need a pencil to mark where you should drill the wall with a 1 /2" drill bit to put in the hardware (H). You will need apply the hardware (H) into the hole that you drilled on the wall. Rockefeller 20.
07 D = 02x E = 02x Connect the Floating Open Hanging Closet on the wall with the hardware (E + D) D Rockefeller 20.