Owner's Manual

Part Number: 000013325 Rev 02 6/17 23
Section 2 Installation
Step 5 Open Valves for the Line Set.
You will not hear refrigerant flow when the valves are
opened. Refrigerant will not flow until the ice machine is
started and the solenoid valve opens.
All valve caps must be reinstalled, tightened and leak-
checked to assure no refrigerant leakage exists.
Counterclockwise opens all valves:
Refer to chart and open the shutoff valves for the suction
and liquid lines the correct number of 360° turns.
Valve Tubing Size Number of Turns to Open
3/8" 6
1/2" 5/8" 3/4" 10
7/8" 14
USE ALLEN WRENCH TO OPEN (TURN
COUNTERCLOCKWISE) SHUTOFF
VALVES FOR THE LIQUID AND
SUCTION LINES
QuietQube Models
USE ALLEN WRENCH
TO OPEN (TURN
COUNTERCLOCKWISE)
SHUTOFF VALVES
FOR THE LIQUID AND
SUCTION LINES
Ice Beverage Models
USE ALLEN WRENCH
TO OPEN (TURN
COUNTERCLOCKWISE)
SHUTOFF VALVES
FOR THE LIQUID AND
SUCTION LINES
I1470C/I1870C/I2170C
,
Caution
After opening suction and discharge valves, refrigerant
pressure will not be detected until the ice machine starts
a freeze cycle and the solenoid valves energize.