Specifications
Table Of Contents
- Q_Model_TOC_uc.pdf
- Model Numbers 1-1
- How to Read a Model Number 1-1
- Ice Cube Sizes 1-1
- Accessories 1-2
- Model/Serial Number Location 1-3
- Warranty 1-4
- Warranty Coverage 1-4
- General 2-1
- Ice Machine Dimensions 2-1
- Ice Storage Bin Dimensions 2-3
- Remote Condenser Dimensions 2-4
- Location of Ice Machine 2-5
- Stacking Two Ice Machines on a Single Storage Bin 2-5
- Ice Machine Heat of Rejection 2-5
- Leveling the Ice Storage Bin 2-6
- Air-Cooled Baffle 2-6
- Electrical Service 2-7
- Self-Contained Electrical Wiring Connections 2-9
- For United Kingdom Only 2-9
- Remote Electrical Wiring Connections 2-10
- Water Supply and Drain Requirements 2-11
- Cooling Tower Applications (Water-Cooled Models) 2-11
- Remote Condenser/Line Set Installation 2-13
- Remote Ice Machine Usage with Non-Manitowoc Multi-Circuit Condensers 2-17
- Installation Check List 2-19
- Additional Checks for Remote Models 2-19
- Before Starting the Ice Machine 2-20
- AuCS® Automatic Cleaning System 2-20
- Component Identification 3-1
- Ice Machine Sequence of Operation Q200/Q280/Q320/Q370/Q420/Q450/Q600/Q800/Q1000/Q1300/Q1600/Q1800 3-2
- Remote Q450/Q600/Q800/Q1000/Q1300/Q1600/Q1800 3-4
- Operational Checks 3-6
- General 4-1
- Ice Machine Inspection 4-1
- Exterior Cleaning 4-1
- Cleaning the Condenser 4-2
- Interior Cleaning and Sanitizing 4-4
- Removal from Service/Winterization 4-12
- Checklist 5-1
- Safety Limit Feature 5-2
- Q_Model_Section_1_uc.pdf
- Q_Model_Section_2_uc.pdf
- Section 2 Installation Instructions
- General
- Ice Machine Dimensions
- Ice Storage Bin Dimensions
- Remote Condenser Dimensions
- Location of Ice Machine
- Stacking Two Ice Machines on a Single Storage Bin
- Ice Machine Heat of Rejection
- Leveling the Ice Storage Bin
- Air-Cooled Baffle
- Electrical Service
- Self-Contained Electrical Wiring Connections
- For United Kingdom Only
- Remote Electrical Wiring Connections
- Water Supply and Drain Requirements
- Cooling Tower Applications (Water-Cooled Models)
- Remote Condenser/Line Set Installation
- Remote Ice Machine Usage with Non-Manitowoc Multi-Circuit Condensers
- Installation Check List
- Additional Checks for Remote Models
- Before Starting the Ice Machine
- AuCS® Automatic Cleaning System
- Section 2 Installation Instructions
- Q_Model_Section_3_uc.pdf
- Q_Model_Section_5_uc.pdf

Ice Machine Operation Section 3
3-4
Part No. 80-1375-3
Remote Sequence of Operation
Q450/Q600/Q800/Q1000/Q1300/Q1600/Q1800
INITIAL START-UP OR START-UP AFTER
AUTOMATIC SHUT-OFF
1. Water Purge
Before the compressor starts, the water pump and water
dump solenoid are energized for 45 seconds, to
completely purge the ice machine of old water. This
feature ensures that the ice making cycle starts with
fresh water.
The hot gas and harvest pressure regulating (HPR)
solenoid valves also energize during water purge,
although they stay on for an additional 5 seconds (50
seconds total on time) during the initial refrigeration
system start-up.
2. Refrigeration System Start-Up
The compressor and liquid line solenoid valve energize
after the 45 second water purge and remain on
throughout the entire Freeze and Harvest Sequences.
The water fill valve is energized at the same time as the
compressor. It remains on until the water level sensor
closes for 3 continuous seconds, or until a six-minute
time period has expired. The hot gas valve and HPR
solenoid valves remain on for 5 seconds during initial
compressor start-up and then shut off.
The remote condenser fan motor starts at the same time
the compressor starts and remains on throughout the
entire Freeze and Harvest Sequences. (The compressor
and condenser fan motor are wired through the
contactor, therefore, anytime the contactor coil is
energized, the compressor and fan motor are on.)
FREEZE SEQUENCE
3. Prechill
The compressor is on for 30 seconds prior to water flow,
to prechill the evaporator.
4. Freeze
The water pump restarts after the 30 second prechill. An
even flow of water is directed across the evaporator and
into each cube cell, where it freezes. The water fill valve
will cycle on and then off one more time to refill the water
trough. (See Page 4-1.)
When sufficient ice has formed, the water flow (not the
ice) contacts the ice thickness probe. After
approximately 7 seconds of continual water contact, the
harvest sequence is initiated. The ice machine cannot
initiate a harvest sequence until a 6 minute freeze lock
has been surpassed.
Freeze Sequence (Typical Q450 Shown)
Continued on next page …
Revised 6/2003










