Operation Manual
Operation Section 3
3-4
Part Number 000001130 12/08
Operational Checks
GENERAL
Your Manitowoc ice machine was factory-operated and 
adjusted before shipment. Normally, a newly installed ice 
machine does not require any adjustment. 
To ensure proper operation, always follow these 
Operational Checks when starting the ice machine:
• for the first time
• after a prolonged out of service period
• after cleaning and sanitizing
Routine adjustments and maintenance procedures 
outlined in this manual are not covered by the warranty.
SIPHON SYSTEM
To reduce mineral build-up and cleaning frequency, the 
water in the sump trough must be purged during each 
harvest cycle. 
When the water pump de-energizes the level in the 
water trough rises above the standpipe starting a siphon 
action. The siphon action stops when the water level in 
the sump trough drops. When the siphon action stops, 
the float valve refills the water trough to the correct level.
Siphon System Check
Follow steps 1 through 6 under water level check.
WATER FLOAT VALVE CHECK
Before water will flow into the water trough the float 
valve shut-off must be in the OPEN position. 
Water Level
WATER 
LEVEL
SIPHON
CAP
STANDPIPE
DRAIN
PRESS TO 
OPEN
PRESS TO 
CLOSE










