Installation Guide

We proudly support the following industry organizations:
MAPEI Headquarters of North America
1144 East Newport Center Drive
Deerfield Beach, Florida 33442
1-888-US-MAPEI (1-888-876-2734) /
(954) 246-8888
Technical Services
1-800-992-6273 (U.S. and Puerto Rico)
1-800-361-9309 (Canada)
Customer Service
1-800-42-MAPEI (1-800-426-2734)
Services in Mexico
0-1-800-MX-MAPEI (0-1-800-696-2734)
Edition Date: September 18, 2017
PR: 250 MKT: 17-2251
For the most current BEST-BACKED
SM
product data and warranty information, visit www.mapei.com.
All Rights Reserved. Printed in the USA. © 2017 MAPEI Corporation.
RELATED DOCUMENTS
Reference Guide: Surface
Preparation Requirements for floor-
covering installation systems
RGF0409*
* At www.mapei.com
Refer to the SDS for specific data related to health and safety as
well as product handling.
LEG AL NOTICE
The contents of this Technical Data Sheet (“TDS”)
may be copied into another project-related
document, but the resulting document shall not
supplement or replace requirements per the
TDS in effect at the time of the MAPEI product
installation. For the most up-to-date TDS and
warranty information, please visit our website at
www.mapei.com. ANY ALTERATIONS TO THE
WORDING OR REQUIREMENTS CONTAINED
IN OR DERIVED FROM THIS TDS SHALL
VOID ALL RELATED MAPEI WARRANTIES.
Before using, the user must determine the
suitability of our products for the intended use,
and the user alone assumes all risks and liability.
ANY CLAIM SHALL BE DEEMED WAIVED
UNLESS MADE IN WRITING TO US WITHIN
FIFTEEN (15) DAYS FROM DATE IT WAS,
OR REASONABLY SHOULD HAVE BEEN,
DISCOVERED.
maximum when mixed with diluted Planipatch Plus
(B). Blend into the surrounding area and finish to the
required smoothness.
3. Allow at least 60 minutes to dry. Finish with the final
floor covering chosen.
Two-Coat Application Method
1. Select an appropriate flat-edged steel trowel.
2. First coat: Immediately apply mixture of Planipatch
and full-strength Planipatch Plus (C) to the substrate
according to a desired thickness, from 1/16" to 1/8" (1,5
to 3 mm). Blend into the surrounding area and finish to the
required smoothness. Allow to dry completely.
3. Second coat: Immediately apply mixture of Planipatch
and diluted Planipatch Plus (B) to the substrate according
to the desired thickness, from 1/32" to 1/4" (1 to 6 mm).
Ensure that all areas with a first coat are completely covered
by a second coat. Allow at least 60 minutes to dry; thicker
applications may require longer drying times before the
application of flooring adhesives.
CLEANUP
Clean tools and equipment with water while product is still
wet/fresh. Use mechanical means to remove cured product.
PROTECTION
Provide for dry, heated storage on site and deliver materials
at least 24 hours before work begins.
Protect from traffic, dirt or dust from other trades until
the final installation of the floor covering.
Because temperature and humidity (during and after
tile installation) affect the final curing time, allow
for extended periods of cure and protection when
temperatures drop below 60°F (16°C) and/or when the
relative humidity is higher than 70%.
Planip
atch
®
Planip
atch
®