Specifications

23G-Series RO System
3024270 Rev G 103 14Oct13
7.2.6 Difficulty Calibrating Permeate Conductivity
The integrity of the permeate conductivity circuitry on the main logic
board can be verified by connecting a fixed resistor in place of the
conductivity probe.
1. Turn the machine OFF.
2. Unplug the power cord for the ECM-100.
3. Disconnect the permeate conductivity wires from terminal
posts 27 and 28.
4. Install a 5 or 10 K ohm resistor between terminal posts 27 and
28.
5. The resulting conductivity should be displayed on the ECM-
100.
10 K ohm should give a reading of 10 S.
5 K ohm should give a reading of 20 S.
6. If the ECM-100 does not display the correct permeate
conductivity then the main board may need to be replaced.
Contact your equipment supplier.
Refer to Troubleshooting Guide (Section 7.0) for additional
information.
7.2.7 Information to Obtain Before Contacting Your Equipment Supplier
1. Machine installation date.
2. Model number (found on right-hand side of front panel).
3. Serial number (found on right-hand side of front panel).
4. Daily Log Sheets.
5. Detailed description of problem.
6. Software version from software module.
8.0 23G SOFTWARE
8.1 Calibration Procedures
NOTE:
If the software for your main logic board is labeled G2.1 or higher, you
have a Version 2 (V2) main logic board.