Specifications

3024270 Rev G C 14Oct13
5.8 Step-Wise Cleaning 60
5.8.1 Installation of the 23G CIP 61
5.8.2 General Clean-In-Place Procedure 62
5.9 Sanitizing Using a CIP System 65
5.10 Membrane Element Cleaners and Sanitizers for 23G Machines 66
5.11 Pre-filter Replacement Procedure 66
5.12 Recording Performance Data 67
5.13 Preparing Machine for Movement 67
5.14 Membrane Element Replacement 68
5.14.1 Membrane Element Removal 68
5.14.2 Membrane Element Installation 68
5.15 Flow Control Adjustments 73
5.15.1 Leaks 75
5.16 Permeate Divert 78
5.17 Product Water Pressure Relief 78
6.0 OPTIONAL FEATURES AND ACCESSORIES 78
6.1 Level Controls 79
6.2 PH Controller/Sensor (ECM-100-pH) 80
6.3 Printer/Computer Interface 81
6.3.1 Printer Interface 81
6.3.2 Computer Interface 81
6.3.3 Computer Connection 81
6.3.4 Printer Connection 85
6.3.5 Print Test 86
6.3.6 Print Functions 87
7.0 TROUBLESHOOTING 87
7.1 Emergency Alarm Bypass 95
7.1.1 Permeate Conductivity High or Rejection Low Alarms 95
7.1.2 Rejection Low Alarm Due to Failed Feed Conductivity Probe 96
7.1.3 Temperature High Alarm 96
7.1.4 pH Alarms 96
7.1.5 Pressure 96
7.1.6 Permeate Flow (Stuck at Zero) 97
7.2 General ECM-100 Reference/Troubleshooting Guidelines 98
7.2.1 Resetting the ECM-100 99
7.2.2 Check the Main Board Terminal Strip for Good Connections 99
7.2.3 Check the Relay Board Terminal Strip for Good Connections 100
7.2.4 Low Rejection Warning (Due to High Purity Feedwater) 100
7.2.5 Verifying the Temperature Circuitry of the Main Board 102
7.2.6 Difficulty Calibrating Permeate Conductivity 103
7.2.7 Information to Obtain Before Contacting Equipment Supplier 103