Specifications
23G-Series RO System
3024270 Rev G 61 14Oct13
NOTE:
Cleaning may be required as often as once every week or infrequently as
every quarter, depending upon the local water supply conditions.
For more information, or for instructions on long-term machine shutdown
(greater than 72 hours), contact your equipment supplier.
Read and understand all instructions prior to beginning procedure.
CAUTION:
RO units must be rinsed to drain, under normal pressures for a minimum
of one (1) hour before exposing membranes to Minncare
®
and a minimum
of six (6) hours before exposing membranes to formaldehyde or
irreversible damage may occur. This includes start-up of machines with
new membranes and membrane element replacements.
WARNING:
Follow all Material Safety Data Sheet (MSDS) precautions and
Occupational Safety and Health Administrating (OSHA) standards when
introducing a chemical (i.e., cleaning and sanitizing agents).
A typical CIP system includes a tank, pump, connecting hoses which are
connected to the machine in a manner that allows a closed loop for
recirculation of cleaning solutions. Contact your equipment supplier for
assistance in designing, installing, and implementing a suitable CIP
system.
CAUTION:
Prior to sanitizing, a thorough cleaning with Liquid Clean 103 or similar
product is required to avoid membrane damage.
To circulate the cleaning solution through the machine, use non-
collapsible hose piped to feed the machine from the CIP tank through the
CIP pump.
5.8.1 Installation of the 23G CIP
1. Remove cover on tank and remove the Clean-In-Place (CIP)
hoses and fittings.
2. Remove plugs on feed, permeate, and concentrate CIP ports
on right side of the 23G. Install the valves and quick release
fittings provided.










