Specifications
23G-Series RO System
3024270 Rev G 67 14Oct13
2. Remove the pre-filter bowl by rotating it counterclockwise.
3. Remove the old filter.
4. Install the new filter.
5. Re-install the pre-filter bowl.
NOTE:
Failure to change pre-filters may void machine warranty.
5.12 Recording Performance Data
Operating performance data should be recorded daily and kept on file or
submitted to your equipment supplier or Mar Cor Purification. Copies of
data sheets will be required by Mar Cor Purification if a warranty question
arises. Daily Log sheets are included in the instruction manual package
and are useful for recording performance data. In addition, data
automatically stored by the ECM-100 can be downloaded to a printer or
computer file to facilitate and simplify record keeping. Refer to Section 6.6.
In addition to the date, time and 10 “on-screen” performance data
readings, the ECM-100 will also download a record of permeate pressure
and an alarm code. The alarm code provides a record of what causes
machine shutdown conditions. See Section 6.6 for downloading data.
NOTE:
Copies of the logs should be submitted to your equipment supplier.
5.13 Preparing Machine for Movement
Contact your equipment supplier for moving, storage and shipping
instructions.










