Installation guide
14 15
14 15
Step 5: Remove the three screws holding the top control enclosure onto the
motor. Carefully lift the top panel and turn it over to expose the inside
of the terminal box.
Step 6: RuntheHighSpeedBlack,LowSpeedRed,L2,andGroundwiresfrom
the conduit cable through the opening on the right side of the motor.
Step 7: Connect the wire for Circuit 1 from the timer to the opening directly
acrossfromtheBLACKwireontheterminalblock(refertoFigure10).
Step 8: Connect the wire for the Circuit 2 from the timer to the opening directly
acrossfromtheREDwireontheterminalblock(refertoFigure10).
Step 9: Connect the L2 to the opening directly across from the WHITE wire on
theterminalblock(refertoFigure10).
Step 10: Connect the ground to the opening directly across from the GREEN/
YELLOWwireontheterminalblock(refertoFigure10).
Step 11: Screw in the conduit connector into the terminal box on the right side
of the terminal box.
Step 12: Carefully fold the extra wires inside the terminal box and place the top
control panel back on top of the terminal box.
Step 13: Tighten the three screws into the terminal box while applying light
pressure to the top control enclosure.
Step 14: Replace and tighten the screws to mount the seal plate onto the motor.
Step 15: Put a NEW pump seal into the seal plate and onto the motor shaft.
Handle and lubricate seal per manufacturer’s specications.
Figure 10