Installation guide

18 19
18 19
Step 13: Wire the low voltage cable to the automation controller. The speed
connectionsandtheircorrespondingleadcolorsareshowninFigure
17. The (+) marking denotes the positive side controller connection
and the (-) denotes the negative side controller connection.
High Speed:
BLACK(+)
WHITE (-)
Medium Speed:
BROWN(+)
BLUE(-)
Low Speed:
RED (+)
GREEN(-)
Step 14: Replace any access panels on the controller that were removed.
Step 15: Replace and tighten the screws to mount the seal plate onto the motor.
Step 16: Put a NEW pump seal into the seal plate. Handle and lubricate seal per
manufacturers specications.
Step 17: Replace the impeller. Make sure that the impeller can spin freely in the
housing.
Step 18: Replace the diuser.
Step 19: Replace and tighten the bolts that retain the motor/seal plate assembly
to the pump.
Step 20: Connect the appropriately sized ground conductor to the supplied
grounding/bonding lug.
Step 21: Open the inlet and outlet valve.
Step 22: Reapply power and allow motor to accelerate to high speed and oper-
ate there for at least two minutes to assure adequate pump prime has
been established.
Figure 17