Operating instructions
9
InstallatIon
Optional Recording Thermometer
INSTALLATION FOR OPTIONAL RECORDING THER-
MOMETER
The optional Recording Thermometer may be surface or 
panel mounted whichever is preferred.
1.  Remove the top cover of the sterilizer. Remove the 
pipe plug located in the T-tting that also accommo-
dates the safety relief valve and which is connected 
directly to the sterilizing chamber. (See gure to the 
right)
2.  Insert the RTD temperature sensor of the tempera-
ture recorder through the rectangular cutout in the 
top cover then into the pipe from which the plug was 
removed.
3.  Make sure RTD temperature sensor is protruding 
down into the sterilizer cavity but not too much so as 
to interfere with the sheet metal bafe plate. Tighten 
the  compression tting.  Replace  top  cover  onto  the 
sterilizer.
4.  For mounting the recorder on a wall, refer to the re-
corder manual supplied with the recorder.
5.  Electrical connections: The 115/120VAC unit comes 
with a 6’ power cord and three prong plug. This can 
be plugged into any 120V outlet. The 220/230VAC 
unit comes with a 6’ power cord and three prong plug. 
However, due to the many varieties of plugs and out-
lets you may need to replace the plug with the ap-
propriate plug.
The Future Design Recording Thermometer is a 24-hour 
clock and should be run continuously. 
Charts should be changed every 24 hours.
Figure 9 
TO REMOVE THE CHART
1.  Unscrew and remove the chart ‘hub’ knob (attached 
to the chain).
Remove Plug
Figure 10 
2.  Grasp the edge of the chart and lift straight off.
TO INSTALL A NEW CHART
1.  Slide edge of the chart under the two raised tabs lo-
cated under the stylus. 
2.  Locate the center hole of the chart over the center, 
threaded rod. Rotate chart to line up the current time 
of day directly underneath the stylus print head.
3.  Screw the chart ‘hub’ knob back in place, hand tight 
only.










