Stopping and WindGuard units are shipped with
coil(s) factory mounted.
Once the coil has been secured to the cabinet,
access to the motor and fan is through the
removable access panels located on the top of the
cabinet.
Note: Low Profile and Wind Stopping units require
the removal of the coil to access the motor and/or
fans.
All piping should be done by a licensed pipe fitter
and in accordance with local codes and
regulations. Connect the supply and return fittings
as required. All traps and valves are sized and field
installed by others. Standard coil configuration is
right hand supply and left hand return. (FIGS. 3 &
4) Optional temperature controls, if ordered, are to
be field installed by others.
Gas Heated Products
Gas heated products must be mounted on the
inside of the building. The product consists of three
major components: the air curtain, transition
section(s) and indirect gas fired duct furnaces(s)
(FIG 5).
The
transitio
n
section(
s) are
shipped
knocked
down
and are
to be
field
assem
bled
and
installed per their supplemental instructions. (FIG.
6)
Note:
1. Assemble the transition section(s).
2. Measure the width of the transition section(s) to
determine the installation location for the duct
furnace(s).
3. The duct furnace(s) are typically hung from
above, with threaded rods, in order to support
the weight of the duct furnaces. The duct
furnace(s) must be centered and fastened to
the transition(s) with the hardware provided.
4. Move the adjustable filler plates to close gaps in
the transition(s) and secure the flanges to the
transitions.
All gas piping and duct furnace(s) exhaust venting
should be done by a licensed pipe fitter and in
accordance with local codes and regulations. Power
vented exhaust duct runs should not exceed 100’ for
horizontal venting.
In the
United
States,
Installation
must
conform
with local
codesor,
inthe
absenceof
localcodes,
withInstallationoftheNationalFuelGasCode,ANSI
Z223.1latestedition,fromtheAmericanNational
StandardInstitute.Furtherreferenceshouldbemade
totherecommendationofyourfuelsupplier.In
Canada,Installationmustconformwithlocalcodesor,
intheabsenceoflocalcodes,withInsta
llationCodes
forGasBurningAppliancesandEquipment,CGA
StandardCAN/CGA1B149.Furtherreferenceshould
bemadetotherecommendation ofyourfuelsuppli er.
TYPICAL GAS
INSTALLATION
FIG. 3
(
Steam Heated STD Unit
)
FIG. 4
(
Hot Water Heated STD Uni
t
)
TYPICAL STEAM
INSTALLATION
FIG. 5
(
Indirect Fired Gas Heated HV