User guide
Engineer 418 & 818 User Manual  Page 39 
Synchronization 
Each time you start the Engineer control software you will be asked to synchronize the software with the 
project stored on the Engineer itself. Synchronization is an important concept that ensures that whatever it is 
you’re controlling from the software actually represents the settings stored on the device. 
You should always  synchronize before working on a project with an Engineer connected. The choice to skip 
synchronization is available solely as a means of working on a project when the Engineer isn’t connected to 
your computer. 
Zones 
One or multiple outputs on the Engineer can be grouped into zones. Zones allow you to define up to eight 
regions in your venue for which you want to separately control the volume from either the remote control or 
the software. 
This way you save trouble of adjusting each output volume independently. Zones can be named, so they will 
show up on the remote control and in the software in a convenient way. 










