6.1 Initial start-up
WARNING
Before the initial start-up, please ensure that your freeze-dryer is properly
set up and installed (see chapter 5 - "Set-up and connection")
Pos: 115 /01 0 Univ ersal module/ Lee rzeile @ 0\ mo d_12021 162445 00_ 0.docx @ 1 14 @ @ 1
Pos: 116 /200 Ch ris t/360 G T-BA L abo r-Pil ot (STA NDA RDMODU LE )/0 60 Bet rieb/ 060-00 20 Instal l ation v on Zu behörko mpo nent en+++ ++++ +++ ++++ +++++ +++ @ 6\mod_1 299 137 393670 _68. docx @ 35079 @ 2 @ 1
6.2 Installation of accessories
The accessories must be completed in accordance with the drying method
that is applied as well as in accordance with the scope of supply.
The installation instructions can be found in a separate document. Please
contact our sales department if you have any queries.
Pos: 117 /01 0 Univ ersal module/ Lee rzeile @ 0\ mo d_12021 162445 00_ 0.docx @ 1 14 @ @ 1
Pos: 118 /20 0 Ch ri st/3 60 G T-BA L abo r-Pil ot (STAN DAR DMODU LE)/0 60 B et rieb/ 060 -00 30 V orb ereit ung ++ +++ ++++ +++ ++ +++++ ++ ++++ +++ ++++ ++ @ 6\m od_ 129 913 739 402 9_6 8.docx @ 3 508 6 @ 2 @ 1
6.3 Preparation
The ice condenser chamber must be clean and dry.
• Remove any water residues from the preceding run.
• Close the media drain valve and the aeration valve.
• Ensure that all of the valves of the accessories are closed.
• Switch the vacuum pump on.
Pos: 119 /01 0 Univ ersal module/ Lee rzeile @ 0\ mo d_12021 162445 00_ 0.docx @ 1 14 @ @ 1
Pos: 120 /20 0 Ch rist/3 60 G T-BA Labo r-P ilot (STA NDA RDMODU LE )/060 B et rieb/ 060 -0040 Ei n schalt en Al ph a - Gam ma ++ ++ +++++ ++ +++++ ++ +++++ ++++ +++ ++++ ++++ @ 6\m od_ 129 913739 4436 _68 .docx @ 3 5094 @ 2 @ 1
6.4 Switching the freeze-dryer on
• Actuate the mains power switch.
The LSC
plus
control unit performs a self-test and an initialisation. This may
take several seconds.
• Follow the safety instructions and hazard warnings (see chapter 3 -
"Safety")!
Pos: 121 /01 0 Univ ersal module/ Sei tenwe chsel @ 0\ mod_12 0211624 4312_0 .docx @ 105 @ @ 1