Owner manual
Gamma 1-16 LSC&
Gamma 2-16 LSC&
7 Malfunctions and error correction
76
Version 04/2013, Rev. 1.1 of 16/12/2013 • sb
Translation of the original operating manual
Pos: 165 /20 0 Chris t/3 60 GT-BA Labo r-Pi lot (S TAND ARDMOD U LE)/0 70 Stö run gen und Fehl ersuc he/07 0-0 010 -0020 Kei n au sreic hend es Vak uum @ 6\ mod _12 991375 151 07_ 68.doc x @ 351 36 @ 3 @ 1
7.1.2 Insufficient vacuum
NOTE
The vacuum checks must be carried out when the ice condenser is frozen.
Pos: 166 /01 0 Univ ersal module/ Lee rzeile @ 0\ mo d_12021 162445 00_ 0.docx @ 1 14 @ @ 1
Pos: 167 /200 Ch ris t/360 G T-BA L abo r-Pil ot (STA NDA RDMODU LE )/0 70 Stö rungen und Fe hlers uche /07 0-0010 -00 20-0010 K leinfl ans chv erbi ndunge n @ 6\mo d_1 299 137515 528 _68. docx @ 35144 @ 4 @ 1
7.1.2.1 Small flange connections
Leakages are often due to improper small flange connections between the
various components and hose connections or to leakages in the valves.
• Loosen the connection and place the centring ring (with sealing ring
inside) in a centred manner between the flange connections.
• Seal the connection with the clamping ring by tightening the wing nut.
• Ensure that the centring ring neither slips out of place nor gets jammed.
Fig. 67: Small flange and centring ring Fig. 68: Small flange with centring ring
and small flange
Fig. 69: Attaching the clamping ring Fig. 70: Tightened clamping ring
Pos: 168 /01 0 Univ ersal module/ Sei tenwe chsel @ 0\ mod_12 0211624 4312_0 .docx @ 105 @ @ 1