Owner manual
Gamma 1-16 LSC&
Gamma 2-16 LSC&
8 Maintenance and service
Version 04/2013, Rev. 1.1 of 16/12/2013 • sb
81
Translation of the original operating manual
Pos: 191 /20 0 Ch ris t/3 60 G T-BA L abo r-Pi lot (STA NDA RDMOD U LE)/0 80 W artun g u nd In stan dhal t ung/ 080 -0010- 001 0-0 010 Eis kon dens ato rkam mer @ 6 \mo d_1 299 137 726 840 _68. docx @ 35 225 @ 4 @ 1
8.1.1.1 Ice condenser chamber
Before each start-up, ensure that the ice condenser chamber is free from
water residues.
• Open the media drain valve to drain off any liquid. Then, close the
valve.
• If necessary, wipe the ice condenser chamber dry with a cloth.
Pos: 192 /01 0 Univ ersal module/ Lee rzeile @ 0\ mo d_12021 162445 00_ 0.docx @ 1 14 @ @ 1
Pos: 193 /20 0 Ch ris t/3 60 G T-BA L abo r-Pi lot (STA NDA RDMOD U LE)/0 80 W a rtung u nd In st andhal t ung/ 080 -0010- 001 0-0 020 Troc k nun gska mme r Labor @ 6 \mo d_1 299 1377 272 46_68. doc x @ 352 33 @ 4 @ 1
8.1.1.2 Drying chamber
The drying chamber is equipped with the LYO CHAMBER GUARD splinter
protection film.
• In order to prevent the film from being damaged, only use water and
commercially available window cleaning agents as well as synthetic
sponges, soft tissues or a rubber wiper for cleaning.
• Do not dry-clean any drying chambers that are equipped with LYO
CHAMBER GUARD film!
Fig. 71: This adhesive label indicates that the drying chamber is equipped
with a splinter protection film
Pos: 194 /01 0 Univ ersal module/ Lee rzeile @ 0\ mo d_12021 162445 00_ 0.docx @ 1 14 @ @ 1
Pos: 195 /20 0 Ch rist/3 60 G T-BA L abo r-Pil ot (S TANDA RDMOD U LE)/0 80 Wa rtun g und In stan dhalt ung/ 080 -00 10- 0010-0 030 B elüf tung sventi l, Medi enabl aufv entil @ 6\ mod_12 991 377 275 27_ 68.doc x @ 352 41 @ 4 @ 1
8.1.1.3 Aeration valve, media drain valve
Contaminants such as product residues may lead to an insufficient vacuum.
In this case, the aeration valve and the media drain valve must be cleaned.
• Switch the freeze-dryer off and disconnect the mains plug.
• Remove the valve core.
• Clean the valve core and the opening with a moist cloth.
• Clean the O-rings and inspect them for any damage. Damaged O-rings
must be replaced.
1 Valve opening
2 Valve core
3 O-rings
Fig. 72: Valve opening and valve core with O-rings
(example, varies depending of the type of freeze-dryer)