Specifications

13
REFITTING:
12. Fit the BRASS FITTING to the front of the pump using a THREAD SEALANT COMPOUND.
13. Fit the new PUMP to the CHASSIS by inserting the front end first into the RUBBER MOUNT.
14. Hook the rear mount onto the back of the pump.
15. Reconnect the BLACK RUBBER PIPE.
16. Reconnect the POWER wires to the PUMP BROWN INSIDE / BLUE OUTSIDE.
17. Turn machine on and RE-PRIME the system.
18. Refit TOP COVER.
How To Change A PCB:
REFER TO SCHEMATICS / DIAGRAMS IN THE APPENDIX FOR MORE DETAILS
PCB
1. DISCONNECT FROM MAINS SUPPLY.
2. Remove TOP COVER.
3. Remove the 2 screws at the bottom of the PCB HEATSINK from INSIDE THE HEATER
COMPARTMENT.
4. Disconnect the PCB WIRING LOOMS from the PCB (Note orientation before removal).
5. Remove the 2 PLASTIC RIVETS from the 5-pin din socket.