User Manual
20 Shutting down the machine
Shutting down the machine
IMPORTANT: To ensure both the performance and life of you Magnum 2500Hz
is maximised the following procedures should always be followed.
Shutdown procedure
When shutting down the machine, always allow a 5 minute period with the
output set at zero, before removing the power.
Long term storage instructions
When the machine is expected to be out of use for more than 7 days you must
drain the fluid system. To do this follow the following sequence of operations:
• Switch on the machine and wait for the operating temperature to be
reached (Green ‘ready’ LED will illuminate)
• Remove the fluid feed pipe from the fluid bottle, and invert it while
holding it above the machine.
• Prime the machine repeatedly until no more haze is emitted.
• Replace the fluid pipe in the bottle, and allow the machine to reheat
(very important)for at least five minutes.
• Remove the power from the machine and place into storage.










