Specifications

Project: Ganrty Eq Bldg
Title: AET 6B Gantry Equip Build.
Type: Transportation
(WEA File: FL_TAMPA_INTERNATIONAL_AP.tm3)
1) Proposed 2) Baseline
Total
8.80
$138
30.60
$486
ELECTRICITY(MBtu/kWh/$)
8.80
2563
$138
30.60
8944
$486
AREA LIGHTS
4.00
1176
$63
3.60
1057
$57
MISC EQUIPMT
0.50
135
$7
0.50
135
$7
SPACE COOL
2.80
806
$43
6.80
1990
$108
SPACE HEAT
0.00
0
$0
3.10
902
$49
VENT FANS
1.50
446
$24
16.60
4860
$264
Building End Uses
Credits Applied: None
Passing Criteria = 389
Design (including any credits) = 138
Passing requires Proposed Building cost to be at most 80% of
Baseline cost. This Proposed Building is at 28.4%
PASSES
10/2/2012
EnergyGauge Summit® Fla/Com-2010. Section 506.4 Compliant Software. Effective Date: March 15, 2012
Page 4 of 7
21