Marvel 60RD Installation Operation & Maintenance Instructions
S TA RT I N G O U T Remove Packaging Your drawer refrigerator has been packed for shipment with all parts that could be damaged by movement securely fastened. Before installing the drawer refrigerator, be sure all packing materials and tape have been removed. Important Save the carton packaging until your drawer refrigerator has been thoroughly inspected and found to be in good condition. If there is damage, the packaging will be needed as proof of damage sustained in transit.
I N S TA L L AT I O N Select Location The proper location will ensure peak performance of your drawer refrigerator. Choose a location away from heat and out of direct sunlight. Best performance will be maintained when installed within the following parameters: Ideal Ambient Temperature Range* built-in 55-80°F 55-90°F freestanding * Drawer Refrigerator will not perform correctly in ambient temperatures less than 55°F.
F E AT U R E S Control Panel The temperature of your drawer unit ranges from 32°F to 47°F (0°C to 8°C. The temperature can be adjusted using the control panel located on the inside of the top drawer. To change the temperature setting, press the warmer or cooler pads until the display shows the desired temperature. After a few seconds the display will return to the actual temperature of the unit. An empty unit will stabilize in six to eight hours.
C A R E A N D C L E A N I N G O F Y O U R D R AW E R R E F R I G E R ATO R Condenser The condenser tubing inside the cabinet does not require frequent cleaning; however, satisfactory cooling depends on adequate ventilation over the coils. Be sure that nothing obstructs the required air flow openings in front of the cabinet. At least once or twice a year brush or vacuum lint and dirt from the grille.
FULL OVERLAY PANEL INSTALLATION INSTRUCTIONS Step 1: Wood Screws Required 1. A #8 pan head wood screw should be used to properly secure the overlay panel. A total of 8 screws will be needed. 5/16 PHILLIPS HEAD SCREWS HOLDING DRAWER FRONT 2. Use only pan head screws. 3. Do not select a screw that is longer than the wood thickness at the screw locations. 4. Use recommended pilot holes for the frame material (see chart below).
FULL OVERLAY PANEL INSTALLATION INSTRUCTIONS Step 3: Sizing the Overlay Panel 23.63 14.63 15.19 7.59 .56 .56 11.81 23.06 Step 4: Attaching the Overlay Panel to the Door 1. Set overlay panel on drawer front face and align edges. Clamp panel in position and mark pilot hole locations. See step 3 for nominal size and hole locations. Drill pilot holes (remove panel if necessary, re-align and re-clamp overlay to drawer face). 2.
TROUBLESHOOTING PROBLEM POSSIBLE CAUSE CORRECTION Odor in cabinet Noisy operation Unit vibrates • • • • • • • • • • • • • • • • Clean inside of unit. See “Care and Cleaning” pg. 7. Adjust leveling legs. See leveling leg instructions. Adjust leveling legs. See leveling leg instructions. Rebuild floor or move to a different location. Replace LED light. Test outlet with lamp. Turn unit on with on/off pad on Control Panel. Plug unit into power source. • • • • • • • • • • • • • Reset house fuse.
O B TA I N I N G S E RV I C E Before Calling for Service Before calling for service, check the following items: 3. In all correspondence regarding service, be sure to give the model number, serial number and proof of purchase. • Make sure unit is plugged into outlet. 4. Try to have information or description of the nature of the problem, how long the unit has been running, the room temperature and any additional information that may be helpful in quickly solving the problem.
WA R R A N T Y Entire Product Limited One Year Parts and Labor Warranty Marvel warrants that it will supply all necessary parts and labor to repair or replace in the end user's home or office, any component which proves to be defective in material or workmanship, subject to the condition and exclusions stated below, for a period of one year from the date of purchase by the end user.
NOTES 11
WWW.MARVELINDUSTRIES.COM Phone: (765) 962-2521 I N Fax: (765) 962-2493 MARVEL D U S T R I E 233 Industrial Parkway P.O.