Owner's Guide

Step 3: Attach the Integrated Panel to the
Drawer
1. Set the integrated panel on drawer front face and align
edges. The custom integrated panel should be flush
with the top of the drawer and centered on the width of
the drawer. Clamp panel in position and mark pilot hole
locations. Pick the required pilot hole size from the
table below and drill the pilot holes ensuring not to drill
all the way through the integrated panel.
Pilot Hole Drill Sizes for Wood Screws
Material Type #8 Wood Screw
Hardwood
1
8 Diameter Pilot Hole
Softwood
7
64 Diameter Pilot Hole
2. Insert wood screws through clearance holes and
tighten to secure integrated panel.
3. Reinstall gasket into channel. Make sure the corners
are fully inserted.
4. Place the drawer divider back into the drawer.
Integrated panel
ush with top
edge of drawer
Using clearance holes in
gasket channel mark
hole locations onto panel
Screw clearance
hole through
gasket extrusion
Custom
integrated panel
to be
centered on width
of drawer.
INTEGRATED PANEL INSTALLATION
17