Installation Guide

4
CONCRETE WALL
PREPARATION
If installing into drywall - please proceed to step 7.
Position the track by measuring up from the door
height (H) + 1 3/4" to the center of the track. Also
ensure a gap of 3/8" - 1/2" at the bottom. Ensure the
track is level and leave a minimum of 2" from the end
of the track to the side of the opening (as shown).
If installing with an opening for 80" standard door
size, remove the top trim and cut the side trim
horizontally along the height of the opening.
5
CONCRETE WALL
PREPARATION
Position the track in place ensuring that it is
level, mark the holes on the track using a pencil
and pre-drill 5/16" holes into the concrete.
6
CONCRETE TRACK
INSTALLATION
Important: Before mounting track, slide both stoppers
onto the end of the track inside the first hole.
Note: The stoppers are handed.
When installing directly into concrete, insert using the
provided anchors and carriage bolts (with washers).
Ensure to un-screw to separate the carriage bolt and
anchor to install correctly, securing with a wrench.
78 3/4” (2000 mm)
Door height + 1 3/4”
Minimum 2”
(51 mm)
3/8 (9.5 mm),
1/2” (12.7 mm)
gap under the
door
5/16” (8 mm)
Drill depth
1 3/8”
(30 mm)
78 3/4” (2000 mm)
Door height + 1 3/4”
Minimum 2”
(51 mm)
3/8 (9.5 mm),
1/2” (12.7 mm)
gap under the
door
5/16” (8 mm)
Drill depth
1 3/8”
(30 mm)
78 3/4” (2000 mm)
Door height + 1 3/4”
Minimum 2”
(51 mm)
3/8 (9.5 mm),
1/2” (12.7 mm)
gap under the
door
5/16” (8 mm)
Drill depth
1 3/8”
(30 mm)
Track length
Barn Door Installation Guide
BARN DOOR HARDWARE TOP MOUNT KIT
©2017 Masonite International Corporation. MIC-171901
1-800-663-DOOR masonite.com