Measurement Guide

3
MARKING TRACK LOCATION FOR
CONCRETE WALL INSTALLATION
IF INSTALLING INTO DRYWALL PLEASE
PROCEED TO STEP 6.
Using a ladder, tape measure and speed square,
find the center line position of the track by
adding 1-3/4" to the door height and measuring
up from the floor. Mark with a pencil.
To find end location of the track, measure 3"
over from edge of opening. Mark with a pencil.
(FIGURE 3)
When installing with a standard 80" height
opening, the top trim will need to be removed,
and the top of the side trim cut horizontally
along the height of the opening. (NOT SHOWN)
4
CONCRETE WALL
PREPARATION
Position the track in place using the marks in
the previous step. Ensuring it is level and using
the track as a template, mark mounting hole
locations for the track using a pencil.
(FIGURE 4) See installation tip below.
Predrill the concrete at marked location using
5/16" masonry drill bit.
Remove metal anchors from bolts and install
into holes using a hammer. (FIGURE 5)
INSTALLATION TIP: locate and temporarily
install track with one end bolt without spacer.
This will hold one end of the track up so you
can move the free end to ensure the track
will be level then proceed to mark the other
locations of mounting holes.
5
CONCRETE TRACK
PREPARATION
Install track with bolts, washers and
spacers using 13mm wrench. (FIGURE 5)
5/16” (8 mm)
Drill depth
1 3/8”
(30 mm)
Track length
Door height + 1 3/4”
3” from
opening
3/8” (9.5 mm),
1/2” (12.7 mm)
gap under the
door
FIGURE 3. Locate the position of the track
FIGURE 4. Drilling mounting holes in concrete
FIGURE 5. Track mount
5/16” (8 mm)
Drill depth
1 3/8”
(30 mm)
Track length
Door height + 1 3/4”
3” from
opening
3/8” (9.5 mm),
1/2” (12.7 mm)
gap under the
door
13mm Wrench
5x
5/16" (8mm x 60mm)
Carriage Bolt
5x
3/8" Washer
5x
5/16" (8mm x 25mm)
Anchor
Hammer
Tape Measure
Speed Square
Barn Door Installation Guide
FOR
1-800-663-DOOR masonite.com
©2022 Masonite International Corporation. RTL-22001
V STRAP KITS