Instruction manual
* Do not apply any voltage measurement between the 10A 
terminal and the COM terminal. 
* Caution when working with voltages above 60Vdc or 30Vac 
rms. Such voltages pose a shock hazard. 
* When using the probes, keep your fingers behind the finger 
guards. 
* When making connections, connect the common test lead 
before connecting the live test lead; when disconnecting, 
disconnect the live test lead before disconnecting the 
common test lead. 
* Before changing functions, disconnect the test leads from 
the circuit under test. 
* For all dc functions, including manual or auto-ranging, to 
avoid the risk of shock due to possible improper reading, 
verify the presence of any ac voltages by first using the ac 
function. Then select a dc voltage range equal to or greater 
than the ac range. 
* Disconnect circuits power and discharge all high-voltage 
capacitors before testing resistance, continuity, diodes, or 
capacitance. 
* Before measuring current, check the meter's fuse and turn 
off power to the circuit before connecting the meter to the 
circuit. 
* Never perform resistance or continuity measurements on 
live circuits. 
* In TV repair work, or when carrying out measurements on 
power switching circuits, remember that high amplitude 
voltage pulses at the test points can damage the multimeter. 
Use of a TV filter will attenuate any such pulses. 
* Use three 1.5V AAA batteries, properly installed in the 
Meter's battery case, to power the Meter. 
3 
* Replace the batteries as soon as the battery indicator 
(   ) appears. With a low battery, the Meter might 
produce false readings that can lead to electric shock and 
personal injury. 
* Do not measure voltages above 600V in Category III, or 
1000V in Category II installations.   
1.1.3 Symbols: 
Symbols used in this manual and on the instrument: 
Caution: refer to the instruction manual. 
Incorrect use may result in damage to the device 
or its components. 
Dangerous voltage may be present. 
~ 
AC (Alternating Current) 
DC (Direct Current) 
AC or DC 
Earth ground 
Double insulated 
Fuse 
Conforms to European Union directives 
1.1.4 Instructions 
* Remove test leads from the Meter before opening the Meter 
case or battery cover. 
* When servicing the Meter, use only specified replacement 
parts. 
* Before opening up the instrument, always disconnect from 
all sources of electric current and make sure you are not 
charged with static electricity, which may destroy internal 
components. 
4 









