Specifications
INSTALLATION
14 March 2014 / Mass Charger 24/15-2; 24/25-2; 24/25-2 DNV / EN
4.15 INSTALLATION STEP-BY-STEP
9
Check all wiring; see also figure 8 for wiring
details. If everything is all right, close the
connection compartment by fixing the two
screws.
10
Continue with section 4.16 for
commissioning of the Mass Charger.
7
Option: Connect the Mass Charger to the
MasterBus network.
5
3
Open the connection compartment by
loosening the two screws.
8
The factory setting of the Mass Charger is
optimal for most installations. Sometimes
however, it is desirable to change these
settings. See ch. 5 DIP switch adjustment
and cha
p
ter 7 for MasterBus settin
g
s.
7
Attach the battery temperature sensor to the
casing of the main battery bank .
Plug the temperature sensor cable into the
“temp.sensor” jack.
6
Connect second battery bank:
Connect the DC-wiring of the
second battery bank (max. 3A).
This bank has a common
negative with the main battery.
4
Feed the AC wiring through
cable gland and connect the
wiring to the screw terminals.
Tighten the cable gland firmly.
2
Place the four screws first and
hang the Mass Charger over
them. Then fix the Mass to the
wall by securing the screws.
1
Mark the position of the mounting spots using
the drilling dimensions.
Connect the DC-cabling of the house
bank, positive to +, negative to –.
+ -