Installation & Assembly

INSTALLATION GUIDELINES
(14-JULY-2013) Page 4 / 4
Protect New Floors
With the setting materials less than 7 days old, protect the new floor from heavy rolling loads by placing
plywood on the floor in the path of heavy equipment like: scissors/man lift, pallet jack and similar. Even with
plywood, it is recommended that NO extremely heavy loads like forklifts move across the new floor until after 7
days. During the first 7 day period protect the new floor from point loading.
Required bond adhesive - Rapid Set Bond Mortar
FOLLOW ARE THE SUGGESTED SETTING MATERIALS MANUFACTURERS:
Mapei Granirapid fast set bi-component;
TEC-Fast Set 3N1® Performance Mortar;
Laticrete 254 Rapid fast set.
According to the type of installation, we recommend that you consult with your adhesive manufacturer’s
specialist who can guide you to the best solution.
Ver-12-2-2015
Customer Service: 1-800-657-7866 or 954-522-7866 e-mail: info@matrix-z.com visit our on line gallery @
www.matrix-z.com