Specifications

7
MatrixxTankInstallationInstructions
WATERPRESSURE:Aminimumof20poundsofwaterpressureisrequiredforregenerationvalvetooperateeffectively.
ELECTRICALFACILITIES:Anuninterruptedalternatingcurrent(A/C)supplyisrequired.Note:Othervoltagesareavaila
ble.Pleasemakesureyourvoltagesupplyiscompatiblewithyourunitbeforeinstallation.
EXISTINGPLUMBING:Conditionofexistingplumbingshouldbefreefromlimeandironbuildup.Pipingthatisbuiltupheavily
withlimeand/orironshouldbereplaced.
LOCATIONOFMATRIXXTANKANDDRAIN:TheInfusiontankshouldbelocatedclosetoadraintopreventairbreaksand
backflow.
CAUTION:Waterpressureisnottoexceed80psi,watertemperatureisnottoexceed110°F(43°C),andtheunitcannotbesubjectedto
freezingconditions.
MediaInstallation
AssemblyInstructions
MediaInstallation(forHTOsystemspleaserefertotheQuickStartGuide)
1)Removethetankfromcarton.
2)Verifytherisertubeiscenteredinthebottomcenterofthetank.Aflashlightmaybenecessary.
3)Placeapieceofducttapeovertherisertubesonomediaenterstheriserwhilefilling.
4)Makesuretheriseriscenteredtofacilitatethevalvein
stallationafterinstallationofthemedia.
5)UsetheBlueFunnelprovided,topourthemediaintothe
tank.Pouritevenlyaroundtheholetoensureitiswelldis
tributedinthetankandpourslowenough,tokeepfrom
pluggingthehole.
6)Whenmediaisinstalledmovetanksidetosidetosettlethe
media.
Installation,OperationandMaintenanceManual
MatrixxMX-100,MX-150,MX-200System