Specifications

8
AssemblyInstructions
ValveInstallation
1)Removethetapefromtheriseranddiscard.
2)Lubricatethetwoo-ringswithalightcoatofSilicone.
3)InstalltheUpperBaskettothevalve,twistingittolockitinplace(ifnotalreadyinstalled).
4)SliptheUpperBasketovertheRiserslidingitdownintoplaceandscrewthevalveonandtighten.
5)Followtheinstallationproceduresinthismanualandprogramaccordingly.
CAUTION
Donotexceed120psiwaterpressure.
Donotexceed110°Fwatertemperature.
Donotsubjectunittofreezingconditions.
Installation,OperationandMaintenanceManual
MatrixxMX-100,MX-150,MX-200System
GeneralInstallation
WaterPressure Minimum25PSI
ElectricalSupply UninterruptedAC
ExistingPlumbing Freeofanydepositsorbuild-upsinsidepipes.
UnitLocation
Locateclosetodrainandconnectaccordingtoplumbingcodes
BypassValves Alwaysprovideforbypassvalveifunitisnotequippedwithone.
Plumbing
Softener and or other water treatment equipment should be installed to local plumbing codes
Figure5.PipingDiagram
1.Locatethesoftenertankandbrinetankclosetoadrainwherethesystemwillbeinstalled.Thesurfaceshouldbecleanand
level.