Specifications

August 2018 xcore connect™ Page 7 of 10
Installation / Balance
Continue with the installation making sure that all of the end boards are ≥ 8-inch in length and for plank installations, the
end seams are random and ≥ 8-inch apart (FIGURE 4). Insert the male side into the female side inclined at an angle of 15
to 20 degrees and gently tap into place using a tapping block and hammer plank until it is connected flush to the first row,
make sure the block is flush with the board before tapping it (FIGURE 5).
If required, cut any door jamb from/at the bottom to allow the flooring to slide underneath using a hand saw and using an
off-cut of flooring as a guide (FIGURES 7 and 8).
Protection
Protect the clean flooring if required, using sheets of plywood and tape all seams.
Maintenance Instructions
Precautions
Follow facilities Standard Operating Procedures (SOP). All Safety Data Sheets and product label instructions must be
read, understood and followed before using the product.
Initial Cleaning (after installation)
xcore connect™ does not require initial cleaning; however, any construction dirt and debris should be removed before
any trafficking by dust mopping, and only if required, damp mop following the protocol the “Daily Cleaning”.
Finish
xcore connect™ does not require any coats or finish to be applied.
Regular Cleaning
Dust mop or vacuum the floor to remove dirt or grit and follow one of the following options:
1. Damp mop using a flat microfiber mop and a suitable neutral cleaning solution like Diversey Profi or similar. Change
the microfiber head often as required (after each patient room), and allow the floor to dry before use.
2. Steam clean the floor using a suitable steam cleaning machine with a microfiber pad and distilled water only.