Installation Instructions

Table Of Contents
nanoLTE E61 AP Hardware Installation Installation Overview and Requirements
NANO_INST_43325 v205_0.6 for N4G_2.5 © ip.access Limited 2019 Page 10
2.3.6 Thermal Protection
The E61 AP may become warm during normal operation.
Ensure the AP is in a location where it will be at least 20cm away from personnel and any
items that may be heat sensitive.
2.3.7 Backhaul (IP) Bandwidth Requirements
At maximum capacity and with IPsec in use, the E61 AP requires:
Downlink: 110Mbps
Uplink: 10Mbps
This will provide bandwidth for 32 users.
2.3.8 E61 AP Installation Tool Requirements for Wall Mounting
To mount the bracket onto the wall:
4 pan head screws, size No. 6 (approx 3.5mm (0.14in) in diameter), for the AP
bracket.
Wall plugs if required.
Suitable drills and screwdriver.
Note: A set of 4 standard screws and 4 standard wall plugs are included with the E61 AP. The
screws and wall plugs are suitable for solid walls. It may be necessary to source alternative
fixings if they are not suitable for the type of wall material on site.