User's Manual

MID POWER
37dBm Octa Band
Digital Radio
Commercial in Confidence
© Copyright 2020, Mavenir 7 | P a g e
Preparation
Unpacking and Inspection
Unpack and inspect the packages as follows:
1. Open the shipping packages carefully for each unit from the protective packing sponge.
2. Ensure that all equipment and accessories have been delivered.
3. Ensure that all equipment and accessories have no damage. If there is any damage, contact your Mavenir service agent.
Tools
Electric drill, cross head screwdriver, side cutters, ladder, and other tools are needed for M2RU installation which is not offered from
Mavenir for now. Customers to provide these tools themselves.
Drilling Machine
Pen
Allen Wrench T5
Combination
Spanner 17mm
Nut M10 and M12